Past Projects


Gonzaga Performing Arts Center
Gonzaga Myrtle Woldson Performing Arts Center
New 52k SF multi-purpose theater and performing arts center. The building contains a 759-seat theater, a 169-seat recital hall, support spaces for staff, students, and performers. This project was built under new energy code with specific, stringent, and atypical acoustical & aesthetic requirements. The project consisted of specialty lighting, theatrical lighting control, theatrical audio and video fiber system, addressable fire alarm system, and point to point access control and security system.
Post Falls Veteran’s Home
Post Falls Veteran’s Home
The Post Falls Veterans Home is a 64-bed skilled nursing facility which has a centralized community center, chapel, therapy room, dining room, sports club with big screen televisions, multiple common areas, and a Bistro. The facility also includes a common food preparation area, a laundry facility, maintenance supply areas, a covered pickup and drop-off area, and parking for 90 vehicles.
Shadle Branch Library
Shadle Branch Library
The expansion of the current locations to 30,000 square feet includes improved children’s discovery area to impact early children’s literacy outcomes, improved areas for quiet reading and study and flexible use spaces for large or small meetings
SIA Upgrades
Spokane International Airport Upgrades
Spokane International Airport Upgrades project includes adding numerous way-finding and information electronic signs throughout the airport. Project also included exterior pole mounted cameras and side gate lighting.
VA MRI Replacement
Spokane Veteran Affairs MRI Replacement
Replace the MRI machine at the Spokane Veteran Affairs Hospital in Spokane Washington. Project included updated lighting along with new data connections, and mechanical control.
SIA ELD
Spokane International Airport ELD Upgrades
Spokane International Airport ELD Upgrades project includes Installing (2) equipment racks, populated with disconnect that are going to replace existing disconnects. Set and terminate 3 transformers. Set and wire (1) 15KV sectionalized cabinet. One 550’ 4” PVC concrete encased duct bank. Pulling approximately 7,700’ of 1C #2 15KV cable. MV Terms, 600V wiring pulling and terms, and two equipment cut overs. (outages) DEMO existing.
FAFB
Fairchild Air Force Base
Peterson Electric is proud of our continued work at Fairchild Air Force Base for over 25 years. Here is a small list of our projects on base:
  • Armed Forces Reserve Center
  • Entry Gates
  • Medical Training Facility
  • Refueling Maintenance Building
  • Post Office
  • Fitness Center
  • DEPMEDS
  • Building 1238
  • Building 2050
  • Hangers
Looff Carousel
Looff Carousel
The Looff Carousel reconstruction design was inspired by old music boxes that encased miniature carousels in glass. This new structure surrounds the Looff Carousel with an enclosure of glass panels to recreate the look of those old music boxes on a grand scale. Theatrical lighting system provides a state-of-the-art experience while you ride and enjoy views of the park.
Dish Hughes
Dish Hughes
Dish Echo Star-Hughes consisted of installing a new satellite dish with the associated cabling.